my footsteps all way long

my footsteps all way long
afie;before & after

Saturday, October 16, 2010

- top ten tallest building in the wurl -

A skyscraper is a tall, continuously habitable building. There is no official definition or height above which a building may clearly be classified as a skyscraper.Here I have created list of top 10 tallest buildings in the world.

1.Burj Khalifa-Dubai


known as Burj Dubai prior to its inauguration, is a skyscraper in Dubai, United Arab Emirates, and the tallest man-made structure ever built, at 828 m (2,717 ft) Construction began on 21 September 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010. The tower's architecture and engineering were performed by Skidmore, Owings, and Merrill of Chicago. Adrian Smith. The total cost for the Burj Khalifa project was about US$1.5 billion and With Dubai itself mired in a deep financial crisis that forced it to seek repeated billion-dollar bailouts from its oil-rich neighbor Abu Dhabi, the opening ceremony and surprise renaming of the tower to Burj Khalifa, after UAE President Khalifa bin Zayed Al Nahyan.

2.Taipei 101-Taipei
Taipei 101also known as the Taipei Financial Center, is a landmark skyscraper located in Xinyi District, Taipei, Taiwan.The building ranked officially as the world's tallest from 2004 until the opening of the Burj Khalifa in Dubai. Taipei 101, designed by C.Y. Lee & Partners and constructed primarily by KTRT Joint Venture and numerous subcontractors including Samsung C&T.Taipei 101 comprises 101 floors above ground and 5 floors underground. Taipei 101 is owned by the Taipei Financial Center Corporation (TFCC) and managed by the International division of Urban Retail Properties Corporation based in Chicago.

3.Shanghai World Financial Center-Shanghai
SWFC is a supertall skyscraper in Pudong, Shanghai, China. It is a mixed use skyscraper which consists of offices, hotels, conference rooms, observation decks, and shopping malls on the ground floors including Park Hyatt Shanghai which is the highest hotel in the world.On 28 August 2008, the SWFC officially opened for business and two days later, the Observation Deck opened with a view from 3 levels.Designed by Kohn Pedersen Fox and the construction work started on 27 August 1997 but due to asian finacial crisis project completed on 17 July 2008.

4.International Commerce Centre-Hong Kong
ICC Tower is a 118 floor, 484 m (1,588 ft) skyscraper completed in West Kowloon, Hong Kong; as part of the Union Square project built on top of Kowloon Station.The development is owned and jointly developed by MTR Corporation Limited and Sun Hung Kai Properties, Hong Kong's metro operator and largest property developer respectively.Upon completion in 2010, the skyscraper became Hong Kong's tallest building and has the third highest roof in the world, after Burj Khalifa and the Shanghai World Financial Center.

5.Petronas Twin Towers-Kuala Lumpur
The Petronas Twin Towers also known as Twin Towers, in Kuala Lumpur, Malaysia were the world's tallest buildings from 1998 to 2004, when their height was surpassed by Taipei 101. The towers remain the tallest twin buildings in the world.Designed by Argentine architects César Pelli and Djay Cerico under the consultancy of Julius Gold, the Petronas Towers were completed in 1998 after a seven year build and became the tallest buildings in the world on the date of completion.

6.Nanjing Greenland Financial Center-China
The Nanjing Greenland Financial Center is a 450-metre (1,480 ft) supertall skyscraper completed in April 2010 in Nanjing, China. The 89-story building features retail and office space in the lower section, and restaurants and a public observatory near the top. The tower’s stepping is functional, helping separate these sections.Marshall Strabala and Adrian Smith, who also worked together to design Burj Khalifa, designed the competition winning building for the Nanjing Greenland Financial Center.

7.Willis Tower-Chicago
Willis Tower, formerly named Sears Tower, is a 108-story 1,451 feet (442 m) skyscraper in Chicago, Illinois. In 1974, it was the tallest building in the world. Currently, Willis Tower is the tallest building in the United States and the fifth-tallest freestanding structure in the world as well as the fifth tallest building in the world to the roof.

8.Guangzhou West Tower-China
Guangzhou West Tower is a 103 story, 440.2 m (1,444 ft) tall supertall skyscraper. Construction of Guangzhou West Tower, designed by Wilkinson Eyre.IFC was constructed and is owned by IFC Development, a consortium of Sun Hung Kai Properties, Henderson Land and Towngas.


9.Trump International Hotel and Tower-Chicago
The Trump International Hotel and Tower, also known as Trump Tower Chicago and locally as the Trump Tower, is a skyscraper condo-hotel in downtown Chicago, Illinois. The building, named after real estate developer Donald Trump.It was designed by architect Adrian Smith of Skidmore, Owings and Merrill and built by Bovis Lend Lease.When topped out in 2009 it became the second-tallest building in the United States after Chicago's Willis Tower.

10.Jin Mao Tower-Shanghai
The Jin Mao Tower is an 88-story landmark supertall skyscraper in the Lujiazui area of the Pudong district of Shanghai in China.It contains offices and the Shanghai Grand Hyatt hotel.It was designed by the Chicago office of Skidmore, Owings & Merrill.

Friday, October 15, 2010

IPTIM AMAL ISLAMI 2010

its really work..hahahaha
i must be da one in da Malaysia books of record..hehe
S.I.I.U.C = K.U.I.S
won second runner-up in malay speech
me and college debate team

IPT ISLAM MALAYSIA (IPTIM) AMAL ISLAMI 2010 CARNIVAL

VENUE : KOLEJ ISLAM DARUL EHSAN,PERAK DARUL RIDZUAN

DATE : 3 - 5 AUGUST 2010

EVENTS : SPEECH (M&W) ( ARABIC,ENGLISH & MALAY)
ISLAMIC CALIGRAPHY (M&W)
HAFAZAN (M&W)
TILAWATUL QURAN (M&W)
NASYEED (M&W)
ZANJI (M&W)
DEBATE

- BAKUN DAM -


Wabak penyakit ‘melioidosis’ atau bakteria disebabkan air dan tanah yang menular di Sarawak dikatakan menjejaskan pekerja di empangan hidroelektrik Bakun.

Namun menurut pegawai daripada Jabatan Kesihatan Sarawak, terdapat pekeliling yang dikeluarkan bulan ini yang melarang mereka daripada mengeluarkan sebarang maklumat berhubung melioidosis.

“Kami menerima arahan daripada pegawai kanan agar tidak mengeluarkan sebarang maklumat bermula bulan ini, walaupun beberapa bulan sebelum ini, kami juga tidak keluarkan sebarang kenyataan,” katanya sambil menambah beliau tidak boleh mendedahkan sebab larangan itu.

Bagaimanapun Ketua Pengarah, Kementerian Kesihatan, Tan Sri Ismail Merican berkata beliau tidak dimaklumkan berhubung sebarang larangan itu.

Permohonan bertulis

Seorang pegawai di Jabatan Kawalan Penyakit Berjangkit juga menafikan berhubung larangan itu tetapi berkata sebarang maklumat akan hanya diberikan jika ada permohonan bertulis.

Wabak itu menarik perhatian apabila pada 10 Julai lalu, enam penduduk kampung yang terbabit dalam misi mencari dan menyelamat seorang mangsa lemas di Hutan Lipur, Lubuk Yu, dekat Maran, Pahang meninggal dunia dalam tempoh seminggu selepas operasi itu.

Semua mereka yang terbabit dalam operasi bermula 26 Jun hingga 30 Jun itu, disahkan meninggal dunia akibat jangkitan bakteria leptospirosis (air kencing tikus) dan melioidosis (bakteria disebabkan air dan tanah). Kejadian itu menyaksikan kawasan rekreasi itu ditutup dan dibersihkan oleh pelbagai agensi kerajaan. Lebih menggemparkan lagi apabila dua hari lalu, seorang anggota Balai Bomba dan Penyelamat Bandar Jengka yang terlibat dalam operasi itu menjadi mangsa terbaru.

Malaysiakini menghubungi Jabatan Kesihatan Sarawak bagi mendapatkan perangkaan berhubung dakwaan wabak itu juga mungkin menular di kalangan pekerja pembinaan di empangan Bakun.

Bakun: Sembilan mati, 50 dijangkiti.

Menurut seorang pegawai pengurusan bagi satu daripada sub-kontraktor projek berkenaan, sebahagian daripada pekerja di situ dijangkiti sejak projek itu bermula. Pegawai yang tidak mahu dikenali itu melahirkan kebimbangannya kerana mendakwa beliau mempunyai maklumat berhubung sembilan orang yang telah meninggal dunia akibat dijangkiti sejak setahun lalu.

Katanya lagi, dia menjangkakan tidak kurang 50 lagi pekerja di syarikatnya telah pulih selepas menerima rawatan sepanjang tempoh yang sama. Kebanyakan pekerja adalah rakyat asing dan mereka lazimnya dihantar pulang selepas dirawat kerana syarikat tidak mahu mengambil risiko kebimbangan penyakit itu menular. Penyakit itu dilaporkan boleh kembali walaupun mereka yang telah dirawat itu telah pulih.

Dakwanya lagi, majikannya telah menghantar pulang 10 pekerja atas sebab berkenaan sepanjang tahun lalu dan ada juga yang dihantar pulang tanpa rawatan. “Pekerja yang mati tidak menerima rawatan pada peringkat permulaan kerana mereka tidak melaporkan yang mereka sakit. Ini kerana mereka bimbang akan dihantar pulang,” katanya.

Pekerja-pekerja terbabit dipercayai terdedah kepada jangkitan ketika menjalankan tugas-tugas menggerudi tanah. “Saya bimbang ini akan berterusan dan menular kepada pekerja di empangan Murum,” katanya.Beliau juga mendakwa dua orang kini terlantar di unit rawatan intensif (ICU) di hospital Bintulu, termasuk seorang penduduk kampung masyarakat Belaga yang dipindahkan berikutan pembinaan empangan itu. (Dipetik dariapada Portal Berita Malaysiakini)

to all ma fellow, while searching an info bout bakun dam,ive just found that these article is really interesting. lets check it out..




- S U A R A O R A N G U L U B E L A G A -

Dua hari lalu saya dan 10 ribu Orang Ulu Bakun-Sg.Asap begitu bersyukur kerana TV2 begitu prihatin mengemukakan permasalahan kami penduduk Bakun-Sg.Asap, melalui dokumentari pendek “Galeri Mandarin Nasional”. Walaupun dokumentari ini hanya memakan masa 10 minit setiap episod. Kami tetap bersyukur kerana hanya dengan cara itu sahajalah permasalahan kami dapat diketengahkan dan seterusnya harapan kami pihak kerajaan akan mengambil tindakan untuk membantu kami segera dan bukan bila menjelang pilihanraya.

Namun kegembiraan kami cuma hanya seketika, apabila hari ini, rancangan dokumentari 10 episod itu telah dihentikan siaranya dengan serta merta. Ketika meminta penjelasan daripada Ketua Pengarah RTM Datuk Ibrahim Yahaya, Datuk Ibrahim memaklumkan bahawa siri dokumentari itu telah tamat (maksudnya dokumentari itu hanya dua episod sahaja). Jelas sekali Datuk Ibrahim Yahaya berbohong kepada saya dan 10 ribu masyarakat Orang Ulu Belaga.Ketika meminta penjelasan lebih lanjut Datuk Ibrahim memaklumkan bahawa beliau sibuk dan sedang bermesyuarat,perbualan kami terhenti disitu sahaja.

Saya mempersoalkan kenapa masalah sebenar rakyat tak ingin didengar oleh pemerintah. Sedang rancangan drama dan hiburan ditayangkan sampai 2 hingga 3 jam. Penting sangatkah slogan “1Malaysia” sehingga semua masa siaran TV,radio dan media cetak hanya melagukan 1Malaysia. Tapi masalah rakyat slot 10 minit pun tak dibenar disiarkan. Kerajaan membayar RM77 juta kepada APCO dan berjuta-juta ringgit lagi untuk tujuan promosi 1Malaysia. Tapi bila tiba masa pengimplimentasian 1Malaysia. Rakyat diketepikan dan kerajaan memekakan telinga.

Saya mencabar Perdana Menteri Najib Razak. Jika benar 1Malaysia bukan hanya slogan.Menjelang 12.20 tengahari besok dokumentari Bakun-Sg.Asap akan keudara semula, dan besar kemungkinan undi 10 ribu Orang Ulu Belaga akan memihak Barisan Nasional. Tetapi jika tidak, kami terpaksa memilih kepimpinan pembangkang untuk salurkan permasalahan kami.

Dalam waktu terdekat ini, jika kerajaan melalui TV2 masih enggan menyiarkan rancangan dokumentari Bakun-Sg.Asap.Kami seluruh penduduk Bakun akan mengemukakan bantahan rasmi kepada kerajaan. Pastinya nanti pentas PRK Sibu akan menjadi medan pungutan suara untuk menolak kerajaan Barisan Nasional.

Untuk rekod, kami penduduk Bakun Sg.Asap telah mengemukakan permasalahan kami melalui Deklarasi Sg.Asap pada tahun 2003 kepada KSN pada waktu itu Tan Sri Samsudin Osman dan yang kedua kepada Timbalan Ketua Menteri Sarawak Tan Sri Jabu pada 2008. Kedua-dua deklarasi ini masing-masing ditandatangani oleh mendiang Temenggong Talik Lisut (2003) dan Datuk Sri Temenggong Nyipa Batok(2008). Semua ketua kaum turut sama menandatangani dan menyokong deklarasi tersebut. Namun sehingga kini pihak BN masih memekakan telinga.


EPISOD DOKUMENTARI BAKUN-SG.ASAP YANG TELAH DAN BELUM DISIARKAN.

Pertama: Masalah ekonomi yang dihadapi 10 ribu orang asli di 15 rumah panjang, dan cadangan penyelesaiannya. (Telah disiarkan pada 26 April 2010)


Kedua: Masalah kemiskinan yang timbul berikutan tanah tanaman yang tidak subur dan tidak cukup. (Telah disiarkan pada 27 April 2010)

Ketiga: Bantuan kepada petani yang diberikan oleh kerajaan, dan maklum balas petani. (Dijadual untuk disiarkan pada 28 April, ditarik secara tiba-tiba)

Keempat: Masalah berhenti belajar kanak-kanak yang disebabkan masalah pengangkutan dan ekonomi. (Dijadual untuk disiarkan pada 29 April, telah dibatalkan)

Kelima: Apakah kesudahan tanah, rumah panjang, pampasan perpindahan yang pernah dijanjikan oleh kerajaan kepada orang asli. (Dijadual untuk disiarkan pada 30 April, lah dibatalkan.)

Keenam: Sejauh manakah Empangan Bakun diperlukan? Kajian keperluan elektrik. (Dijadual untuk disiarkan pada 3 Mei, telah dibatalkan.)

Ketujuh: Nasib kubur orang asli di kawasan hulu Empangan Bakun, dan budaya perkuburan kaum tersebut. (Dijadual untuk disiarkan pada 4 Mei, telah dibatalkan.)

Kelapan: Kesan Empangan Bakun terhadap ekosistem kawasan hilir, dan 10 ribu penduduk di situ. (Dijadual untuk disiarkan pada 5 Mei)

Kesembilan: Adat dan hak tanah orang asli di kawasan hilir empangan, dengan kes kajian Long Bangan. (Dijadual untuk disiarkan pada 6 Mei)

Kesepuluh: 12 tuntutan daripada penduduk Sungai Asap terhadap kerajaan dan pemaju empangan. (Dijadual untuk disiarkan pada 7 Mei, digugurkan)